I got the backdrop from Pemberton to south of Cayoosh installed, joints finished, primed and painted. It is all done except for Cayoosh.

back to progress page

The first photo shows the area before the upper deck and backdrop are finished

The next 2 photos show the area after the backdrop has been finished. The start of the scenery shell can also be seen

April 2013