British Columbia Railway
    Squamish Subdivision
   
    British Columbia Railway
    Squamish Subdivision
   
The track at Seton was installed. I installed a siding and a double connected back track. When the project was finished I acquired a 1985 track profile which showed 2 double connected back tracks. One back track was for OCS and the other had a dock for loading lumber delivered by Evans I will update this soon.